Train 7034 · Forge Park/495 → South Station
One MBTA Commuter Rail trip, stop by stop. MBTA trip IDs repeat on every day the timetable runs; this page shows the latest day reported.
Franklin/Foxboro Line · November 25, 2026 · MBTA trip ID FBTieJobPhase2-880086-7034
1 active service alert
- The Endicott Mini-high platform project has begun. Passengers and local residents can expect pedestrian path changes to platform, construction vehicles, and construction activity during the day through the Winter of 2026.
Stops
The newest MBTA prediction for each stop on November 25, 2026, in stop order. Times are Boston time (UTC-5); predictions are not observed arrivals.
| Station | Track | Arrives | Departs |
|---|---|---|---|
| Forge Park/495Track 1 | 1 | – | |
| FranklinTrack 1 | 1 | ||
| NorfolkTrack 1 | 1 | ||
| WalpoleTrack 1 | 1 | ||
| Windsor GardensTrack 1 | 1 |
Open the MBTA live board in Terminal. Pro and trial accounts can save their coverage and station filters in a workspace.
Open MBTA in Terminal