MBTA Commuter Rail
Boston-region commuter rail lines, stations and predicted departures from the MBTA.
14 active service alerts
- Please board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00 pm.
- Please board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm.
- Please board all outbound Framingham/Worcester Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00 pm.
- Providence Line Train 6028 (2:25 PM from Wickford Junction) is operating 5-15 minutes behind schedule between Wickford Junction and South Station.
- New Bedford Line Train 8020 (1:03 PM from New Bedford) is operating 5-15 minutes behind schedule between East Taunton and South Station.
- Fall River Line Train 8111 (1:05 PM from South Station) is operating 5-15 minutes behind schedule between South Station and Fall River.
- Route 128 Station notice: Premium parking is available at this location. You can buy premium passes and permits using SpotHero.
- Littleton/Route 495 passengers can expect occasional traffic and detours when accessing the station due to the Foster Street reconstruction work.
- There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway.
- The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.
- To accommodate renovations at Providence Station, construction barriers have been installed and the southern stairwell to Track 1 is out of service. Staircase access is available to Track 3 and Track 5.
- Fare Validation Machines are being installed at all Fairmount Line stations. Passengers will need to validate their fare to scan through the gates at South Station.
- The Endicott Mini-high platform project has begun. Passengers and local residents can expect pedestrian path changes to platform, construction vehicles, and construction activity during the day through the Winter of 2026.
- The Wyoming Hill Mini-high platform project has begun. Passengers and local residents can expect construction vehicles and activity during the day through the Winter of 2026.
Lines
| Line | Terminals | Stations | Trains today |
|---|---|---|---|
| Fairmount LineSouth Station – Readville / Fairmount | South Station – Readville / Fairmount | 9 | 39 |
| Fall River/New Bedford LineSouth Station – New Bedford / Fall River | South Station – New Bedford / Fall River | 14 | 38 |
| Fitchburg LineNorth Station – Wachusett / Littleton/Route 495 | North Station – Wachusett / Littleton/Route 495 | 17 | 23 |
| Foxboro Event ServiceSouth Station | South Station | 6 | 0 |
| Framingham/Worcester LineSouth Station – Worcester / Framingham | South Station – Worcester / Framingham | 18 | 35 |
| Franklin/Foxboro LineSouth Station – Forge Park/495 / Providence | South Station – Forge Park/495 / Providence | 28 | 29 |
| Greenbush LineSouth Station – Greenbush / Braintree | South Station – Greenbush / Braintree | 10 | 15 |
| Haverhill LineNorth Station – Haverhill / Reading | North Station – Haverhill / Reading | 15 | 30 |
| Kingston LineSouth Station – Kingston / Braintree | South Station – Kingston / Braintree | 10 | 17 |
| Lowell LineNorth Station – Lowell / Haverhill | North Station – Lowell / Haverhill | 8 | 28 |
| Needham LineSouth Station – Needham Heights / Forest Hills | South Station – Needham Heights / Forest Hills | 12 | 23 |
| Newburyport/Rockport LineNorth Station – Rockport / Newburyport | North Station – Rockport / Newburyport | 15 | 38 |
| Providence/Stoughton LineSouth Station – Providence / Stoughton | South Station – Providence / Stoughton | 13 | 48 |
Trains today counts distinct MBTA trips with a departure prediction today.
Fairmount Line
Fall River/New Bedford Line
Fitchburg Line
Foxboro Event Service
Framingham/Worcester Line
Franklin/Foxboro Line
- South Station
- Back Bay
- Newmarket
- Ruggles
- Uphams Corner
- Four Corners/Geneva
- Talbot Avenue
- Morton Street
- Blue Hill Avenue
- Fairmount
- Hyde Park
- Readville
- Endicott
- Dedham Corporate Center
- Route 128
- Islington
- Norwood Depot
- Norwood Central
- Canton Junction
- Windsor Gardens
- Sharon
- Walpole
- Norfolk
- Mansfield
- Franklin
- Forge Park/495
- Attleboro
- Pawtucket/Central Falls
Greenbush Line
Haverhill Line
Kingston Line
Lowell Line
Needham Line
Newburyport/Rockport Line
Providence/Stoughton Line
Stations on each line are the ones MBTA predictions have linked to it. Their order is derived: sorted by distance from the line’s Boston terminal.
Open the MBTA live board in Terminal. Pro and trial accounts can save their coverage and station filters in a workspace.
Open MBTA in Terminal