Train 8065 · East Taunton → New Bedford
One MBTA Commuter Rail trip, stop by stop. MBTA trip IDs repeat on every day the timetable runs; this page shows the latest day reported.
Fall River/New Bedford Line · November 25, 2026 · MBTA trip ID FBTieJobPhase2-879940-8065
1 active service alert
- The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.
Stops
The newest MBTA prediction for each stop on November 25, 2026, in stop order. Times are Boston time (UTC-5); predictions are not observed arrivals.
| Station | Track | Arrives | Departs |
|---|---|---|---|
| East TauntonTrack 2 | 2 | – | |
| Church StreetTrack 1 | 1 |
Open the MBTA live board in Terminal. Pro and trial accounts can save their coverage and station filters in a workspace.
Open MBTA in Terminal