Train 8024 · New Bedford → South Station
One MBTA Commuter Rail trip, stop by stop. MBTA trip IDs repeat on every day the timetable runs; this page shows the latest day reported.
Fall River/New Bedford Line · November 25, 2026 · MBTA trip ID FBTieJobPhase2-879871-8024
3 active service alerts
- Fall River Line Train 8111 (1:05 PM from South Station) is operating 5-15 minutes behind schedule between South Station and Fall River.
- New Bedford Line Train 8020 (1:03 PM from New Bedford) is operating 5-15 minutes behind schedule between East Taunton and South Station.
- The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.
Stops
The newest MBTA prediction for each stop on November 25, 2026, in stop order. Times are Boston time (UTC-5); predictions are not observed arrivals.
| Station | Track | Arrives | Departs |
|---|---|---|---|
| New BedfordTrack 1 | 1 | – | |
| Church StreetTrack 1 | 1 | ||
| East TauntonTrack 1 | 1 | ||
| MiddleboroughTrack 1 | 1 | ||
| BridgewaterTrack 1 | 1 | ||
| CampelloTrack 1 | 1 | ||
| BrocktonTrack 2 | 2 | ||
| MontelloTrack 2 | 2 | ||
| Holbrook/RandolphTrack 1 | 1 | ||
| BraintreeTrack 1 | 1 | ||
| Quincy CenterTrack 1 | 1 |
Recent vehicle observation
Provider-reported vehicle location linked to this service. Observations expire after six minutes.
41.8281° N, 71.026° W
Open the MBTA live board in Terminal. Pro and trial accounts can save their coverage and station filters in a workspace.
Open MBTA in Terminal